Accelerating Climate Efforts and Investments (ACE) project supports the objectives of the LIFE program by strengthening capacities, encouraging investments, developing, demonstrating, and promoting innovative climate change mitigation solutions, participating in the creation of a knowledge base, and disseminating and applying best practices. The project’s most significant positive environmental impacts result from the ACE LIFE consortium’s low-carbon investments, which target low-emission logistics and machinery, electrification of industrial processes, and the development of plant-based protein and peat production value chains.
The tender processes carried out within the ACE LIFE project adhere to the principles of fairness, transparency, and equality. Thanks to a non-discriminatory approach, bids are evaluated based on their merits and their alignment with the stated requirements.
This page will announce the project’s upcoming, ongoing, and past procurements.
Investments and purchases above 25 000 eur
Suomen ympäristökeskus (Syke)
Purchase or investment |
Sum (€) |
Status |
Cases: concept and production |
100 000 |
Ongoing |
Luonnonvarakeskus (Luke)
Purchase or investment |
Sum (€) |
Status |
Dams and other items for rewetting |
177 583 |
Upcoming |
Service for making rewetting plans, services for the greenhouses |
41 000 |
Upcoming |
Oyj Ahola Transport Abp (Ahola)
Purchase or investment |
Sum (€) |
Status |
HUB area planning |
25 000 |
Completed |
Designing and building of charging station structures and roof |
200 000 |
Completed |
Cables and transformers |
390 000 |
Completed |
Pilot electric truck
|
270 000 |
Completed |
Pilot biogas long-haul truck |
150 000 |
Completed |
HUB Infra arrangement |
60 000 |
Completed |
Electricity supply connection and electrical capacity allocation |
145 000 |
Completed |
Installations of chargers, transformers, piping etc. |
40 000 |
Completed |
Linkosuon Leipomo Oy (Linkosuo)
Purchase or investment |
Sum (€) |
Status |
Technical design expertise to define implementation and integration details of the equipment |
50 000 |
Upcoming |
Investment to replace oil and natural gas with electricity in the food production process |
618 000 |
Upcoming |
Kajaanin Romu Oy (KR)
Purchase or investment |
Sum (€) |
Status |
Electric-powered excavator for material handling in scrap yard |
307 008 |
Completed |
Kiteen Mato ja Multa Oy (KMM)
Purchase or investment |
Sum (€) |
Status |
Packaging line |
100 000 |
Upcoming |
Renting material cutting machinery (150 ha) |
150 000 |
Upcoming |
Raw material (reed biomass for growing media) |
80 000 |
Upcoming |
Plugit Finland Oy (Plugit)
Purchase or investment |
Sum (€) |
Status |
Specification and planning of the low-emissions energy ecosystem |
50 000 |
Ongoing |
Energy Storage, BMS and related prototyping procurement |
290 000 |
Ongoing |
V2G (Vehicle to Grid) specific hardware & components |
60 000 |
Upcoming |
Charging equipment hardware to the charging station |
100 000 |
Completed |
Metsäliitto Osuuskunta (Metsä Group)
Purchase or investment |
Sum (€) |
Status |
Electric charging infrastructure design and planning |
50 000 |
Upcoming |
Transparent real time reporting of CO2 emissions (ICT modifications) |
50 000 |
Upcoming |
Piloting non-fossil power options in terminals, transport services and in forestry machines |
100 000 |
Upcoming |
High-capacity electric charging stations and installation |
300 000 |
Upcoming |
Liikenne- ja viestintävirasto (Traficom)
Maailman Luonnon Säätiö - World Wide Fund For Nature (WWF)
Purchase or investment |
Sum (€) |
Status |
Production of campaign materials and tools on sustainable diets |
60 000 |
Upcoming |
Stora Enso OYJ (Stora)
Purchase or investment |
Sum (€) |
Status |
Piloting electric trucks |
50 000 |
Ongoing |
Piloting electric terminal machinery |
50 000 |
Upcoming |
External service providers for contractor trainings |
50 000 |
Ongoing |
Elinkeino-, liikenne- ja ympäristökeskusten sekä työ- ja elinkeinotoimistojen kehittämis- ja hallintokeskus (KEHA)
Purchase or investment |
Sum (€) |
Status |
Climate impact evaluation web tool |
34 000 |
Upcoming |
Pohjaset Logistics Oy (POHLOG)
Purchase or investment |
Sum (€) |
Status |
Electric truck & trailer for roundwood |
400 000 |
Upcoming |
UPM-KYMMENE OYJ (UPM)
Purchase or investment |
Sum (€) |
Status |
Purchasing electric forklifts to replace gas forklifts |
130 000 |
Upcoming |
Construction needed for electric forklift charging infrastructure on a nursery production site |
70 000 |
Completed |
Electric charging infrastructure for forklifts with solar power |
120 000 |
Upcoming |
Electric charging infrastructure for one of the UPM's mill site |
120 000 |
Completed |
Tuoretie Oy (Tuoretie)
Toijala Works Oy (Toijala Works)
Purchase or investment |
Sum (€) |
Status |
Hydraulic system design |
50 000 |
Upcoming |
Metsähallitus Metsätalous Oy (Metsähallitus)
Purchase or investment |
Sum (€) |
Status |
Piloting electric and/or biogas services for forestry, harvesting and transporting; biogas car |
60 000 |
Ongoing |
Piloting electric and/or biogas services for forestry, harvesting and transporting; forestry and harvesting machinery |
100 000 |
Upcoming |